Fiber and wireless connectivity infrastructure spanning a modern city district
Capability

Enterprise Telecom & Connectivity Integration

Connectivity is the substrate every other system depends on. We design multi-site, multi-carrier networks, run the procurement, and then own the circuit delivery, cutover and lifecycle support — so the network is not a project your team has to chase.

Where these programmes usually go wrong.

Carrier contracts nobody can compare

Quotes arrive in twelve different formats with different SLAs, term lengths and install windows. Comparing them line-by-line consumes weeks of engineering time that should go into architecture.

Circuit delivery slips, and nobody chases it

Carriers commit to install dates that quietly move. Without a single party owning delivery, a 90-day build becomes eight months and the dependent programme stalls behind it.

SD-WAN overlays bolted onto legacy MPLS

Hybrid estates end up with overlapping routing domains, inconsistent QoS and security policy applied twice. Performance problems become impossible to attribute to a layer.

What we deliver

Scope, in plain terms.

Every item below is delivered by our in-house engineering team — design through deployment and into managed operations.

  • Multi-site WAN architecture with documented routing, QoS and failover design
  • Carrier and last-mile sourcing across 330+ vendor-neutral options, normalised into one comparison
  • SD-WAN / SASE design, build and phased migration off legacy MPLS
  • Private 5G and private LTE networks for campuses, ports, yards and industrial sites
  • Dark fiber, wavelength and dedicated internet access procurement and delivery management
  • Circuit project management: order placement, LOA/CFA, site survey, install, test and acceptance
  • SIP trunking, UCaaS and CCaaS migration with number porting and dial-plan design
  • Ongoing NOC monitoring, carrier escalation and contract renewal management
Technology partners relevant to this work
Lumen Technologies logoMegaport logoMeter logoUniti Group logoC Squared Systems logo
Proof point

330+ carrier and connectivity vendors under one comparison

Our engineers hold direct relationships across national carriers, metro fiber providers, subsea and NaaS platforms — which means a single vendor-neutral bill of materials instead of twelve competing sales cycles.

Ready to scope telecom & connectivity?

Run the ten-minute infrastructure assessment for a tailored gap analysis, or speak directly with the engineers who would deliver the work.

Frequently asked questions.

Do you resell carrier circuits or act independently?

We are vendor-neutral. Great Orion holds no exclusive carrier agreements and no preferred-vendor quota. We are compensated only when an engagement closes, which is why our recommendation frequently includes a regional metro provider rather than a tier-one incumbent.

Can you manage a migration off MPLS without downtime?

Yes. We run site-by-site cutovers with the legacy circuit held in service as fallback until the new path passes acceptance testing. Typical enterprise estates migrate in waves of 10-25 sites, with a documented rollback per wave.

How long does a multi-site connectivity programme take?

Design and sourcing typically run 4-8 weeks. Delivery is governed by last-mile availability: on-net buildings complete in 30-45 days, while new fiber builds run 90-180 days. We publish a per-site delivery tracker from day one.

Do you support private 5G in regulated markets?

We design private 5G and private LTE on licensed, shared and unlicensed spectrum depending on the jurisdiction, and manage spectrum licensing applications in the UAE, UK and USA as part of the deployment.

What happens after the network is live?

We stay. Managed services cover 24/7 monitoring, carrier fault escalation on your behalf, change management, capacity reviews and renewal negotiation before auto-renew clauses trigger.